| Change order of pictures?
Is there a way to change the order of the pictures that are uploaded to the gallery? For example, if a user uploads 10 pictures showing 10 different frames from a specific item, and he wants the last frame that was uploaded to be the first, and the first to be the last, can the order be changed?
|